MSE Engenharia acts as a construction manager for industrial projects, with 47 years of experience: planning, coordination and control of schedule, cost and quality, with one team on site and another in the back office dedicated to your project.
Talk about your project →MSE Construction Management is a CAPEX protection framework. It organizes governance, schedule, cost, contracts, quality and procurement so that every deviation reaches the decision-makers before it turns into cost, at the right time and with complete information.
Talk to the people who will be on site. Our team assesses the scope, the schedule and the contracting strategy and recommends the right management structure for your project.
When the decision is to build, expand or modernize a plant, engineering must reduce uncertainty, make CAPEX predictable and ensure the investment becomes an efficient operating asset.
Electrical engineer, graduated from the Federal University of Paraná (UFPR). He founded MSE Engenharia in Londrina, Brazil, in 1979, and today chairs the company's Board. 47 years of engineering for industry, infrastructure, pharma and data centers.
On site, MSE mobilizes managers, engineers, supervisors and analysts for each discipline. In the office, more than 100 engineers and a financial, legal and tax back office support the field team and the client.
Construction management is the coordination of every front of a project on the client's behalf: engineering, planning, inspection, quality, cost, safety, documentation and commissioning. The construction manager does not build the project; it ensures that those who build deliver on time, on budget and with the contracted quality.
On projects with several contractors and suppliers working at the same time, such as data centers and new plants, interfaces are the biggest risk. A construction manager with execution experience spots conflicts early, records every decision and gives the client a single view of the project, from the start of construction to handover.
Before mobilization, MSE and the client define the project's governance: who decides what, approval limits and the committee schedule, formalized in the Contract Governance Manual. Management is also configured around the project's constraints, such as REIDI tax treatment, LEED and AQUA environmental certifications, ESG targets and the client's legal requirements, which then guide decisions and KPIs through to start of operation.
It is a service in which an independent company coordinates, on the client's behalf, everything involved in delivering a project: design, schedule, cost, quality, safety, documents and commissioning. The construction manager does not build; it controls those who build.
It coordinates designers, contractors and suppliers on the client's behalf, oversees execution on site and controls schedule, cost, quality, safety and documentation through to handover.
Inspection checks whether the work follows the design, the standards and the contract. Construction management includes inspection and goes further: it plans, coordinates interfaces between contractors and suppliers, controls schedule and cost and advises the client on decisions.
No. Contractors and designers keep their technical responsibilities. The construction manager coordinates, inspects, controls and advises the client, who keeps the final decisions.
Ideally before the contractors mobilize, while detailed engineering is still under way. That way the construction manager takes part in design coordination, the schedule and the preparation of work packages.
It depends on the size of the project, the schedule, the number of simultaneous work fronts and the team needed on site. For an accurate quote, send the schedule, the designs and the planned contracting strategy.
Yes. MSE mobilizes a dedicated on-site team, with managers, engineers, supervisors and analysts for each discipline, backed by a financial, legal, tax and engineering back office. It also assigns coordinators and engineers to the client's team for a set period.
Before work starts, MSE and the client define who decides what, approval limits, committees and project KPIs. This becomes the Contract Governance Manual. During construction, deviations that hit predefined triggers become formal events and are taken to the board with options and their schedule and cost impact.
Yes. Each engagement is configured around the project's constraints: tax treatment of purchases and services, such as REIDI, environmental certification requirements such as LEED and AQUA, ESG targets and the client's legal requirements. They feed into decision criteria and the KPIs tracked through handover.
New plant, expansion, data center or infrastructure: send us the scope and the schedule, and we will propose the right management structure.