MSE Engenharia is responsible for the development of the Basic Projects for the new taxiway (taxiway) of Londrina Airport, in Paraná.
The airport operates, on average, 700 flights and handles around 50,000 passengers per month. The project is in progress and includes geometric evaluation, civil earthworks, drainage and paving projects, in addition to the horizontal and vertical signage project and the specification of the luminous beacon, including electrical power circuits, in compliance with ANAC guidelines, applicable ABNT standards and good engineering practices, with a paving area of approximately 50,000 m².
Basic Project | Earthworks | Drainage | Paving | Horizontal and Vertical Signage | Light Beacon | Electrical Installations
Project in progress...
Development of technical solutions with definition of systems, construction criteria and parameters for the implementation of the project.
Adjustment and modeling of the terrain through cuts, landfills and leveling, ensuring an adequate base for execution.
Design of drainage systems for collecting and conducting rainwater, preventing flooding and ensuring the durability of the infrastructure.
Design and specification of paving systems, considering loads, traffic, and performance over time.
Development of the road sign project, ensuring orientation, safety and compliance with applicable regulations.
Design of beacon systems with light signals, ensuring visibility and operational safety.
Design of electrical systems for power supply, lighting and support for infrastructure operating systems.