Quality that starts in fabrication and continues through start-up.
The performance of an electromechanical assembly depends on decisions made before the field: design coordination, erection sequence, welding control and test planning. At MSE, engineering, fabrication and execution work together to turn plant requirements into safe, documented systems ready to operate. Commissioning and start-up complete the process.
Fabrication and Pre-assembly
Spools, supports and structures fabricated in the shop, with dimensional and welding control.
Industrial Piping
Process and utility piping in carbon steel, stainless steel and HDPE, with hydrostatic testing and flushing.
Equipment Installation
Lifting, positioning, alignment and hook-up of pumps, tanks, presses and process equipment.
Every electromechanical assembly starts with understanding the process it will serve. Flows, loads, materials, site conditions and operating requirements guide the engineering decisions, the erection sequence and the project plan.
The process begins with design review and coordination between disciplines. Then come shop fabrication and pre-assembly, mobilization, field erection and system hook-up. After execution follow testing, commissioning, start-up and delivery of as-built documentation.
Lead time depends on plant size, piping and structural tonnage, the amount of equipment and integration with civil works and suppliers. Off-site pre-assembly and parallel work fronts shorten the total time to start-up.
Cost varies with scope, tonnage, specified materials, schedule and site conditions. For an accurate quote, it helps to share the available drawings, bills of materials, isometrics and the project schedule.
Contracting mechanical, piping, structural and electrical work separately multiplies interfaces and responsibilities. In integrated assembly, one company coordinates every front, reducing interferences, rework and schedule risk.
Start-up requires testing each system, integrating disciplines and verifying safety conditions. Planning commissioning from the design stage makes it possible to energize, pressurize and bring the plant into operation predictably.
We deliver electromechanical assembly to connect process, utilities and power, from fabrication to plant start-up.
Industrial piping, steel structures and pipe racks, equipment installation, electrical, instrumentation and automation, thermal insulation and commissioning, either integrated or by discipline.
Yes. MSE works with in-house engineering, supervision, welding and erection teams, responsible for planning, execution and quality control in the field.
Yes. The scope can include testing, commissioning, assisted start-up and delivery of technical documentation such as data books and as-built drawings.
Yes. MSE delivers electromechanical assembly across Brazil, mobilizing crews, site facilities, workshop and equipment for each project.
Send, when available, the detailed design, isometrics, bills of materials, scope by discipline and the planned schedule. Also let us know the site location, site conditions and commissioning requirements.