MSE Engenharia is responsible for the development of the Conceptual, Basic and Executive Projects for the new Effluent Treatment Plant (ETE) of ADM, in Campo Grande, Mato Grosso do Sul.
A ADM (Archer Daniels Midland Company) is an American multinational with a strong presence in agribusiness, food processing and nutrition, operating globally in the transformation of agricultural commodities into products with high added value.
The project includes the complete detailing of engineering solutions for the treatment system, including civil infrastructure, structures, electrical installations, automation, pipes and auxiliary systems, ensuring operational efficiency, environmental compliance and integration with existing industrial processes.
Conceptual Project | Basic Project | Executive Project | Civil | Structural | Electrical Installations | Automation | Piping | Hydrosanitary Installations | SPCI
Project in progress...
Definition of the guidelines and technical premises that guide the initial development of the project.
Consolidation of technical solutions with definition of systems and construction criteria to make the project feasible.
Detailed preparation of the drawings and technical specifications necessary for the execution of the work.
Design and detailing of spaces, considering functionality, technical standards and integration between disciplines.
Development of the civil and infrastructure solutions necessary for the implementation of the building.
Dimensioning and detailing of metal structures, ensuring safety and construction efficiency.
Design of electrical systems for power supply, energy distribution and lighting.
Design of water, sewage and drainage systems according to technical standards.
Fire Prevention and Combating System Design, in accordance with legal requirements and applicable regulations.
Dimensioning of air conditioning and ventilation systems, aimed at thermal comfort and energy efficiency.