MSE Engenharia was responsible for the development and execution of Eternit's new fiber cement tile factory, located in Caucaia, Ceará.

The project was developed as a greenfield site, encompassing everything from the complete implementation of infrastructure to the full execution of the construction, ensuring an industrial solution aligned with Eternit's operational needs.

Large-scale industrial projects require integration between engineering, planning, and execution.

Greenfield project with an integrated vision

The new unit was conceived on a site without pre-existing infrastructure, requiring detailed technical planning and comprehensive development of engineering disciplines.

MSE Engenharia's scope of work included:

  • Master Plan
  • Conceptual and Detailed Design
  • BIM Projects
  • Architecture and Landscaping
  • Civil and Structural
  • Electrical and Hydraulic
  • Fire Protection System
  • Utilities
  • HVAC

This integrated approach allowed for greater project control, process optimization, and alignment across all project stages.

A greenfield implementation requires precision from the initial design stages.

Technical planning and multidisciplinary solutions

The Master Plan developed by MSE Engenharia defined the technical and operational parameters for the new plant, considering production flows, access points, infrastructure, and the organization of industrial and administrative areas.

Subsequently, the Basic and Executive Projects detailed all necessary technical specifications to ensure construction quality, operational efficiency, and facility safety.

The use of BIM methodology contributed to interdisciplinary coordination, reduction of clashes, and greater efficiency during project development and construction.

Interdisciplinary integration is crucial to ensure industrial performance and efficiency.

Industrial infrastructure geared towards operational efficiency

The implementation encompassed technical solutions aimed at the reliability and functionality of industrial operations.

Key systems developed include:

  • Civil and structural infrastructure
  • Electrical and hydraulic systems
  • Fire protection systems (SPCI)
  • Industrial utilities
  • HVAC system for thermal control and air quality

All systems were developed considering operational performance, safety, and compliance with applicable technical standards.

Each plant system was designed to ensure efficiency, safety, and operational continuity.

Applied engineering for national industry

In addition to project development, MSE Engenharia was also responsible for the complete execution of the work, ensuring construction quality, technical control, and adherence to established deadlines.

MSE's involvement in the undertaking reinforces its experience in highly complex industrial projects, operating in an integrated manner from conception to the final delivery of the facility.

Developing and executing large industrial projects requires engineering prepared to transform planning into results.