MSE Engenharia is responsible for developing the Conceptual and Executive Projects for Dengo Chocolates' new factory in Itapecerica da Serra, SP.
Known for valuing artisanal production and sustainable practices, Dengo entrusted MSE Engenharia with developing technical solutions for adapting an existing warehouse and support buildings, totaling approximately 12,000 m² of built area.
.webp)
Industrial projects require integrated engineering to transform operations, efficiency, and infrastructure into a single solution.
Industrial adaptation focused on operational efficiency
The project was developed to prepare the new manufacturing unit for Dengo's production and operational activities, considering performance, safety, and functionality in all environments.
MSE Engenharia's scope of work covers everything from conceptual definitions to the executive detailing of the project, ensuring alignment between operational needs and the applied engineering solutions.
.webp)
Each project stage is planned to ensure efficiency and reliability in industrial operations.
Multidisciplinary engineering applied to the food industry
The scope involves integrated solutions across various engineering disciplines, ensuring technical compatibility and executive efficiency during project development.
The disciplines covered include:
- Conceptual Design
- Executive Design
- Architecture
- Civil
- Low and Medium Voltage Electrical Installations
- HVAC
- Chilled and Hot Water Systems
- Compressed Air
- LPG
- Plumbing and Sanitary Installations
- Fire Protection Systems
The solutions were developed considering the operational demands of the food industry, in addition to the technical, regulatory, and safety requirements applicable to the project.
Interdisciplinary integration is essential to ensure performance and quality in industrial environments.
Infrastructure prepared for operation and expansion
The electrical systems were sized to ensure energy reliability and operational efficiency, while the HVAC systems were designed to provide thermal control and maintain the quality of the factory environment.
Furthermore, the chilled water, hot water, compressed air, and LPG systems were designed to meet the specific demands of the unit's industrial operation.
The civil and plumbing/sanitary solutions complement the necessary infrastructure for the plant's efficient and safe operation.
.webp)
An efficient industrial infrastructure begins with well-integrated technical solutions.
Engineering aligned with innovation and sustainability
The project's development reinforces MSE Engenharia's expertise in highly complex industrial undertakings, providing integrated services from conceptual design to executive detailing.
Dengo's new factory represents another investment aimed at expanding production capacity, with a focus on efficiency, innovation, and sustainability.
.webp)
.webp)
Developing industrial infrastructure means building strong foundations for growth and innovation.

