The evolution of the packaging industry demands increasingly efficient facilities, capable of keeping pace with production growth and meeting new market logistics demands. To achieve this goal, the expansion of industrial plants must be planned in an integrated manner, ensuring productivity, safety, and operational flexibility.

In this context, MSE Engenharia was responsible for developing the expansion projects for Irani's industrial site in Indaiatuba/SP.

The project includes the expansion of the production area, the implementation of new industrial equipment, and the restructuring of strategic areas within the unit.

Expanding an industrial plant means creating room for growth without compromising operational efficiency.

Infrastructure prepared for increased production capacity

The project was developed to support a new phase of growth for the industrial unit, focusing on process modernization and strengthening operational capacity.

Key interventions include:

  • Installation of three new printing machines
  • Construction of a new coil warehouse
  • Relocation of maintenance areas
  • Reorganization of the stockroom
  • Retrofit of the main access
  • Expansion of parking areas

The improvements were planned to optimize internal flows, reduce operational interferences, and increase the efficiency of production and logistics activities.

A well-planned expansion improves not only production but also the entire operational dynamic of the factory.

Digital technology applied to project development

To ensure greater precision in planning the interventions, MSE Engenharia surveyed the existing facilities using Laser Scanner technology.

The three-dimensional scanning allowed for the creation of a detailed digital representation of the plant, providing precise information for the development of engineering solutions.

The use of this technology contributed to:

  • Greater dimensional accuracy
  • Interdisciplinary compatibility
  • Reduction of rework
  • Better utilization of existing spaces
  • Greater confidence in decision-making

Accurately understanding the existing environment is the first step towards efficient industrial expansion.

Integrated engineering for complex industrial environments

The unit's expansion required the coordination of various disciplines to ensure integration between the new structures and existing systems.

The scope included:

  • Conceptual Design
  • Basic Engineering
  • Detailed Engineering
  • Architecture
  • Civil
  • Building Electrical Systems
  • Plumbing and Sanitary Systems
  • SPCI
  • HVAC

This multidisciplinary approach allowed for the development of solutions aligned with the plant's production needs and the project's technical requirements.

High-performance industrial projects depend on the integration of infrastructure, technology, and operations.

Engineering for the future of the packaging industry

MSE Engenharia's involvement in this project reinforces its expertise in developing solutions for industrial expansion, from initial studies to the technical detailing required for implementation.

By contributing to the expansion of Irani's unit, the company supports the evolution of one of Brazil's leading packaging industries, creating infrastructure prepared to sustain new cycles of growth, productivity, and competitiveness.

Industrial growth occurs when strategy, engineering, and innovation work in the same direction.

Mais posts de

Projetos

VER TODOS

Cadastre-se no nossa Newsletter

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.