+199000 Kg of Steel
+2,378.06 m3 of Concrete
+291000 Kg Metal Structure
+596 meters from Estaca Raiz
+2,573 meters of continuous propeller stake
200 Valves (Guillotine, Diaphragm, Sphere, Drawer, Globe, Butterfly, Retention);
3500 meters of HDPE pipes;
2400 HDPE connections;
3500 meters of Carbon Steel Tubes;
12500 carbon steel connections;
6460 meters of electrical infrastructure;
33000 meters of Power Cables;
44000 meters of Control Cables;
900000 kg of installation in mechanical equipment;
350000 Kg Tons of metal structures;